Prefab House vs. Traditional Constructions: Cost Savings for Oil & Gas


Classification:Company News

Release time:2025-04-08 01:00


Prefab House vs. Traditional Constructions: Cost Savings for Oil & Gas

The oil & gas industry operates under relentless pressure to balance speed, safety, and budget—especially when building remote camps, offices, or maintenance hubs. Traditional construction methods, with their lengthy timelines and ballooning costs, often fall short in meeting these demands. Enter ​prefab houses and ​modular constructions, engineered by industry leaders like ​Lida Group to deliver faster, leaner, and smarter solutions. In this article, we dissect why prefabricated systems are outperforming traditional builds in oil & gas projects worldwide, with a focus on hard-hitting cost savings.


The High Stakes of Oil & Gas Construction

Oil & gas projects are typically located in harsh, isolated environments—think Arctic tundras, desert basins, or offshore platforms. These sites demand infrastructure that can withstand extreme weather, rapid deployment, and minimal environmental disruption. Yet traditional construction methods face critical drawbacks:

  • Long timelines: On-site brick-and-mortar builds take 6–12 months, delaying project start dates.
  • Skyrocketing logistics: Transporting materials and labor to remote areas inflates budgets by 30–50%.
  • Environmental risks: Concrete production and waste generation conflict with ESG mandates.

Prefab houses and ​container house systems address these challenges head-on, offering a modern alternative that slashes costs while boosting efficiency.


1. Upfront Cost Savings: Breaking Down the Numbers

Prefabricated constructions cut expenses at every stage, from factory to site:

Material Efficiency

  • Bulk purchasing: Factories source steel, insulation, and fixtures at scale, reducing material costs by 15–20%.
  • Lean manufacturing: CNC machines cut components with 99% precision, eliminating waste. For example, Lida Group’s ​modular houses reuse 95% of steel offcuts in smaller components.

Labor Optimization

  • Reduced on-site labor: Traditional builds require 20–30 workers for months; prefab units need 5–10 workers for weeks.
  • Lower skilled labor costs: Bolt-and-nut assembly requires minimal training versus specialized masonry or welding.

Case Study: A Shell offshore gas project in Norway saved $1.8M by replacing traditional dorms with Lida Group’s ​prefab houses. Factory production cut material waste by 60%, while on-site labor costs dropped 45%.


2. Speed-to-Site: How Time Equals Money

In oil & gas, delays can cost 500,000 daily. Prefab systems accelerate timelines through:

  • Parallel workflows: Foundation work and module production occur simultaneously.
  • Weather-proof manufacturing: Factories operate year-round, avoiding rain, snow, or heat delays.
  • Plug-and-play installation: A 20-unit camp can be assembled in 10 days versus 6 months for traditional builds.

Lida Group’s Record: For a Chevron project in Kazakhstan, 50 ​container houses were produced in 25 days, shipped via rail, and installed in -20°C conditions within 2 weeks—keeping the project on schedule despite a brutal winter.


3. Long-Term Savings: Durability & Adaptability

Prefab constructions aren’t just cheaper upfront—they offer enduring value:

Maintenance Costs

  • Galvanized steel frames: Resist corrosion in coastal or acidic environments, slashing repainting costs by 80%.
  • Pre-installed utilities: Electrical and plumbing systems are factory-tested, reducing post-installation repairs.

Reusability & Relocation

  • Portable designs: Units can be disassembled and redeployed across projects. ExxonMobil reused 70% of Lida’s ​modular houses from a completed Texas site to a new Gulf of Mexico drill.
  • Resale value: High-quality prefab units retain 50–70% of their value after 10 years.

4. Hidden Costs of Traditional Construction

Brick-and-mortar builds often incur hidden expenses that prefab systems avoid:

  • Weather delays: A 2-week monsoon can derail schedules and inflate labor costs.
  • Regulatory penalties: Non-compliance with modern energy codes (e.g., LEED, BREEAM) leads to fines.
  • Worker turnover: Prolonged projects struggle to retain skilled labor in remote areas.

Prefab Advantage: Lida Group’s ​prefab houses comply with global standards (ISO, EN 1090) and integrate solar/wind-ready systems, ensuring compliance from day one.


5. Sustainability: Cutting Costs While Cutting Carbon

Oil & gas firms face mounting pressure to reduce emissions. Prefab constructions align with ESG goals through:

  • Lower embodied carbon: Steel production emits 30% less CO2 than concrete.
  • Energy-efficient designs: Insulated panels (U-value 0.22 W/m²K) cut HVAC costs by 40%.
  • Circular economy: 90% of Lida Group’s materials are recycled or recyclable.

BP’s Success Story: By using Lida’s solar-powered ​container houses in Oman, BP reduced camp energy costs by 35% and achieved net-zero operational emissions.


6. Risk Mitigation: Financial Safety in Modular Design

Prefab systems de-risk projects through:

  • Fixed-price contracts: Factory production avoids cost overruns from material price spikes.
  • Quality control: Units undergo 200+ quality checks in controlled factories, reducing defect rates to <0.5%.
  • Scalability: Add or remove modules as project scope changes, avoiding costly redesigns.

Why Lida Group Dominates Oil & Gas Prefab Solutions

With 500+ projects completed in oil & gas hotspots like the Permian Basin and North Sea, Lida Group stands apart through:

  • Hybrid designs: Combine ​container houses for住宿 with steel-frame warehouses for equipment storage.
  • Harsh environment engineering: Units withstand -50°C to 50°C, 150 km/h winds, and seismic Zone 5.
  • Global logistics hubs: Warehouses in Dubai, Houston, and Singapore ensure rapid delivery.

Client Testimonial:
“Lida’s prefab houses cut our Alaska camp budget by 42% and accelerated deployment by 5 months. Their durability in -45°C has been flawless.” – Project Manager, ConocoPhillips.


Conclusion: The Future is Prefab

For oil & gas companies, the choice between traditional and prefab constructions is no longer just about cost—it’s about survival in a competitive, ESG-driven market. ​Lida Group’s ​prefab houses and ​modular solutions offer unmatched savings, speed, and sustainability, empowering projects to thrive in the harshest conditions while safeguarding budgets.

prefab house,modular house,modular solutions,constructions