中文版  |  English  | Русский  |  Français  |  Español  | أربيك

language
    Search
    %{tishi_zhanwei}%

    • HOME

    • LIDA SERVICE

      • Integrated Camp

      • Industrial Engineering

      • Civil Engineering

      • Infrastructure Construction

      • Labor Supply

      • Logistic Services

      • Operation Maintenance

      • Construction Materials

      • Planning Design Services

    • LIDA PRODUCTS

      • Camp House

      • Container House

      • Prefabricated House

      • Steel Structure Building

      • Light Steel Villa

      • Others

    • PROJECT CASES

      • Integrated Camp

      • Container House

      • Prefabricated House

      • Steel Structure Building

      • Light Steel Villa

      • Others

    • NEWS CENTER

      • Focused Lida

      • Company News

      • Industry News

    • ABOUT LIDA

      • Brief Introduction

      • Lida's Idea

      • Honors and Awards

      • Factory Information

      • Equipment

      • Marketing Map

    • CONTACT LIDA

    • Homepage
    • ●  Integrated Camp
      • Washing Room & Shower Room
      • Market(Shop) building
      • Prayer Room
      • Recreation building
      • Camp warehouse
      • Laundry building
      • Administration Office & Site Office
      • Clinic building(Medical center)
      • Kitchen and Dining Buildings
      • Accommodation Building
    • ●  Industrial Engineering
      • Greenhouse
      • Airport Terminal and Hangar
      • Steel Structure Laboratories Building
      • Steel Structure Supermarket
      • Showroom Building
      • Cold Storage Building
      • LIDA Steel Structure Warehouse
      • LIDA Steel Structure Workshop
    • ●  Civil Engineering
    • ●  Infrastructure Construction
      • Foundation Engineering
      • Preparation Works
    • ●  Labor Supply
    • ●  Logostic Services
    • ●  Operation Maintenance
    • ●  Construction Materials
      • Fence
      • Sandwich Panel
      • Container House
      • Light Steel Villa
      • Steel Structure
      • Prefabricated House
    • ●  Planning & Design Services
    • paste1600958140327(1).png Integrated Camp

    • w2.png Industrial Engineering

    • w3.png Civil Engineering

    • w4.png Infrastructure Construction

    • w5.png Labor Supply

    • w6.png Logistic Services

    • w7.png Operation Maintenance

    • w8.png Construction Materials

    • w9.png Planning Design Services

    Tel: 0086-532-88966982
           0086-532-88965892
    Website: www.lidajituan.com
    E-mail: sales@lidajituan.com
    Head office: 5th Floor, Building A, Dalen Center, 180 Haier Road, Qingdao, 266000, China

    Infrastructure Construction


      Foundation works, according to the authoritative definition of the National Scientific and Technical Terminology Validation Committee, refers to the use of engineering measures to change or improve the natural conditions of the foundation to meet the design requirements.

            

      Foundation construction process:
      Positioning→ paying review (including axis, coordinates), → pile machine (selection) in place→ piling → pile detection→ excavation of foundation trenches→ pile breaking→ leveling→ pouring concrete cushion → axis leading→ platform formwork and beam bottom formwork installation→ steel bar safety → bearing side formwork and foundation beam side formwork installation→ foundation formwork, steel bar acceptance→ pouring foundation concrete → maintenance→ foundation brick masonry→ backfill
      Three links and one level refer to the prerequisites for the start of capital construction projects, specifically referring to: water, electricity, road and site leveling. Water pass (specifically refers to water supply); Dentsu (refers to the construction of electricity connected to the construction site to meet the construction conditions); Road access (refers to the off-site road has been paved to the entrance around the construction site to meet the vehicle access conditions); Site leveling (refers to the proposed building and conditions site is basically flat, no mechanical leveling, manual simple leveling can enter the state of construction), referred to as three links and one level.

    Related Cases

    图片名称

    Transforming Eastern Europe’s Landscape with Modular Steel Camp Houses

    图片名称

    Poland Container House Camp Project

    图片名称

    LIDA Container House Apartment Hotel Project in Philippines

    Lida Service

    Integrated Camp
    Industrial Engineering
    Civil Engineering
    Infrastructure Construction
    Labor Supply
    Logistic Services
    Operation Maintenance
    Construction Materials
    Planning Design Services

    Lida Products

    Camp House

    Container House

    Prefabricated House

    Steel Structure Building

    Light Steel Villa

    Others

    About Us

    Brief Introduction
    Lida's Idea
    Honorary
    Factory Information
    Equipment
    Marketing Map
    Prefabricated Houses

    Contact Us

    Head Office: 5th Floor,Building A,Darron Center,No.180,Haier Road,Qingdao, 266000,China
    Tel: 0086-532-88966982 88965892  Fax:0086-532-88965571

    WhatsApp:+86 13793209022  
    Mobile/Wechat:+86-15166671720

    Email: sales@lidajituan.com Website: www.lidajituan.com
    Alternate Website: www.lidamodularhouse.com

     

    Head Office: 5th Floor,Building A,Darron Center,No.180,Haier
    Road,Qingdao, 266000,China
    Tel: 0086-532-88966982 88965892 

    Fax:0086-532-88965571
    Email: sales@lidajituan.com
    Website: www.lidajituan.com
    Alternate Websit: www.prefabhousecn.com
    Wechat/WhatsApp:+86-13793209022

     Copyright(c)2023 All Rights Reserved  SEO Business license

    POWERED BY WWW.300.CN