Tel: 0086-532-88966982
0086-532-88965892
Website: www.lidajituan.com
E-mail: sales@lidajituan.com
Head office: 5th Floor, Building A, Dalen Center, 180 Haier Road, Qingdao, 266000, China
Preparation Works
Three connections and one leveling refer to the prerequisites for the commencement of basic construction projects, specifically including water, electricity, roads, and site leveling. Water supply (specifically referring to water supply); Electricity supply (refers to the connection of construction electricity to the construction site with construction conditions); Road access (refers to the road outside the site that has been paved to the entrance around the construction site, meeting the entry and exit conditions for vehicles); Site leveling (refers to the condition where the proposed building and its conditions are basically flat on site, without the need for mechanical leveling, and can be easily leveled manually to enter the construction state), abbreviated as "three connections and one leveling".
Contact Us
Head Office: 5th Floor,Building A,Darron Center,No.180,Haier Road,Qingdao, 266000,China
Tel: 0086-532-88966982 88965892 Fax:0086-532-88965571
WhatsApp:+86 13793209022
Mobile/Wechat:+86-15166671720
Email: sales@lidajituan.com Website: www.lidajituan.com
Alternate Website: www.lidamodularhouse.com
Head Office: 5th Floor,Building A,Darron Center,No.180,Haier
Road,Qingdao, 266000,China
Tel: 0086-532-88966982 88965892
Fax:0086-532-88965571
Email: sales@lidajituan.com
Website: www.lidajituan.com
Alternate Websit: www.prefabhousecn.com
Wechat/WhatsApp:+86-13793209022
Copyright(c)2023 All Rights Reserved SEO Business license